Sonny’s Slab Pour

    We poured the slab for the timber frame octagon right before Christmas last year. Hot water was piped into an array of tubing to warm up the ground to sufficient temperature prior to the pour. The 15,750 sq. ft. building addition at Sonny’s features a partial basement.

    Posted to Blog: Wednesday, March 01, 2017